Kōura Pendant Light
Kōura Pendant Light
Kōura Pendant Light
Kōura Pendant Light
Kōura Pendant Light
Kōura Pendant Light
Kōura Pendant Light

Kōura Bamboo Pendant Light

Regular price $769.00 NZD

Standard Lead Time: 4 - 8 Weeks

The Koura is the Maori name for the small freshwater shrimps found in New Zealand’s rivers.  They curl up in this shape.  This shape is mirrored again in the similar woven baskets used to catch them.  

David Trubridge designs not only create an ambient, rich atmosphere, evoking intimacy and warmth within a space but are also constructed with sustainably sourced bamboo and avoid chemical finishes.

This Pendant is flat packed for a reduced environmental footprint. Assembly time requires 45 mins. Please see Assembly Video in the specification table. 

 

SKU: DT400PL-1
Width300mm | 420mm | 550mm | 950mm | 1100mm | 1400mm

 

Height

500mm | 750mm | 970mm | 1600mm | 2000mm | 2400mm
Depth500mm | 420mm | 550mm | 950mm | 1100mm | 1400mm
Suspension2000mm ( for the 1600H & above suspension is 5000mm)
GlobeE27 Max 60W (Not Included)
ConditionsDry Interiors
MaintenanceCleaned with a soft cloth dampened in warm soapy water. (light Switched off) 
MaterialsBamboo
Warranty3 years for the failure of parts.
Made InNew Zealand

When selecting the item you would like to purchase, please take note of the ‘Lead Time’ displayed above the “Add to Bag” button.

A ‘Lead Time’ is an estimate of the accumulative timeframe it takes for the item to be prepared and/or processed and delivered. Delivery times may vary depending on your location and the courier service. Please note the lead time varies per product meaning if you have multiple items on one order you may experience varying lead times.

Standard Lead Time (Ready to Ship) - Up to 14 days
If your item displays a lead time of up to 14 days, it is a ready-to-ship item from our Australian distributor's warehouse. Once your order is placed, it will be processed and prepared for shipping.

Standard Lead Time (On Order) - Up to 8 weeks
If your item displays a lead time of up to 8 weeks, this is an on-order item. Once your order is placed, it will experience a processing and production timeframe before being prepared to be shipped from our distributor's warehouse.

Standard Lead Time (Special Item) - Up to 18 weeks
If your item displays a lead time of up to 18 weeks, it is a special item that will be carefully sourced to order from our international designers. Once your order is placed, it will be processed and prepared for shipping to our Australian distributor's warehouse. For more information on our special items please visit our FAQs.

Made-to-Order Lead Time - Up to 16 Weeks
If your item displays a made-to-order lead time, these designs are carefully handmade or hand-assembled by our Artisan designers. The lead time of a pre-order design may range between 2-16 weeks, this includes the accumulative time it takes for your order to be processed and for the item to be handmade and/or assembled by the artisan.

Pre-Order
If your item displays a pre-order lead time, it is currently out of stock. The month displayed is an approximate date of arrival to our Australian distributor. Please note this date of arrival, is in addition to the delivery time. The lead time will be updated when the item has returned to stock.

For more information on our delivery lead times please visit our Terms and Conditions or contact our customer service team for more information.

Added to Shopping Bag
Kōura Bamboo Pendant Light
Qty
View Shopping Bag
Continue Shopping
Customers who bought this item also added